Best Practices for Multi Admin Changes in SCM

cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
Community Blogs
4 min read
L1 Bithead

title.png

 

In Strata Cloud Manager (SCM), all administrators within a tenant share a single candidate configuration rather than working in isolated sandboxes.

 

Because of this shared environment, if Admin 2 edits the exact same objects or rules as Admin 1 before Admin 1 pushes their updates, Admin 2’s edits will directly overwrite Admin 1’s uncommitted changes the moment Admin 2 clicks Save.

 

When Admin 1 subsequently clicks Push Config, the outcome depends on the Admin Scope selected in the push dialog:

 

1. Default Behavior: Admin Scope Set to "Current User" (Admin 1 Only)

 

By default, SCM scopes a push strictly to the logged-in administrator's uncommitted changes.

 

  • If Admin 2 completely overwrote the object: Admin 1 no longer has active uncommitted changes on that object, as the latest candidate state now belongs to Admin 2. Assuming Admin 1 made no other edits elsewhere, nothing from that object is pushed, and Admin 2’s changes remain uncommitted in the candidate configuration.
  • If Admin 1 modified dependent objects or fields: Pushing only Admin 1's scope may fail validation or commit checks if Admin 1's remaining changes rely on Admin 2's uncommitted modifications to the shared object.

 

2. Admin Scope Set to "Changes from all admins" (or Both Admin 1 & Admin 2)

 

  • Admin 2’s values are deployed: Because SCM maintains a single candidate configuration state, Admin 2's last-saved version of any overlapping items is committed and pushed to your firewalls or Prisma Access. Admin 1's earlier, overwritten values are permanently replaced.

 

How to Verify and Manage Uncommitted Changes

 

  • Before pushing: Navigate to Configuration > Push Config and expand Admin Scope to see which administrators currently hold uncommitted changes. You can also inspect the object or rule directly in the UI, as the candidate configuration always displays the most recently saved state.
  • After pushing: Navigate to Configuration > Push Status (or Configuration > Config Version Snapshots) to review the exact diff of what was committed in that job.
  • To undo uncommitted changes: Use Push Config > Revert. This supports both per-admin and all-admin scopes, provided there are no structural folder or snippet changes and fewer than 500 uncommitted changes.

 

Additional Best Practices for Emergency Pushes

 

To minimize risk in multi-admin environments, avoid performing a tenant-wide All Admins push whenever possible. Instead, narrow your push by both admin and location, only widening the scope during a coordinated, short-term freeze.

 

1. Start with a narrow push

 

  • Restrict your scope: Set Admin Scope to only the engineer making the urgent change, and set Location to only the target firewall or its specific folder. Location scoping limits what gets committed—not just which devices receive the update—leaving pending work in other folders safely in the candidate draft.
  • Check for system-level changes: Open Compare Configs for that firewall before pushing. Keep in mind that changes saved by System and metadata-admin are included in any partial push.

 

2. When a full push is unavoidable

 

You will need to widen your push if SCM blocks a partial push (displaying "blocked because of following changes by other administrators"), if your fix depends on objects saved by another admin, or if you are pushing to a multi-vsys firewall (where an admin-scoped push can inadvertently remove other vsys configurations). In these scenarios:

 

  • Call a brief freeze: Ask active administrators to pause saving and either finish or revert any in-progress work. A 5- to 10-minute window is usually sufficient.
  • Audit all pending changes: Open Compare Configs with All Admins selected for that firewall and review every pending change—paying close attention to System changes.
  • Document your rollback point: Note the last known good version in Config Version Snapshots before pushing so you have a clear recovery baseline.
  • Push with a narrow location scope: Select All Admins, but keep Location scoped strictly to the single firewall that requires the fix so unrelated changes aren't deployed across your entire fleet.
  • Lift the freeze: Let your team know they can resume normal workflows and push their remaining changes.

 

3. Establish an emergency protocol in advance

 

With a large team of administrators, coordinating a freeze during an active incident adds unnecessary stress. Decide ahead of time who has the authority to call an emergency push freeze and which communication channel will be used to announce it.

  • 33 Views
  • 0 comments
  • 0 Likes
Labels
Contributors