PMTerminal reached End of Support since 31st December 2021. This article lists the best practices for a successful migration to its replacement : Terminal Plugin Controller (TPC).

Steps

To migrate successfully from PMTerminal to TPC, it is recommended to follow carefully a staged plan to prepare, test and validate plugins before moving into production.

The plan is composed of 5 stages:

 

  • Phase 1 : read the different resources.
  • Phase 2 : backup the existing data from the CPM.
  • Phase 3 : map how many plugins will have to be migrated.
  • Phase 4 : test and validate the plugins with TPC in a DEV environment.
  • Phase 5 : rollout the changes in production by batches and monitor.

 

Phase 1

During this stage, consult the following official resources: 
 

Phase 2

During this stage, backup the existing and prepare the environment:
 

  • Make a backup of the Bin folder on the CPMs.
  • Make an export of the current platforms :​

This script can be used : epv-api-scripts/Export-Import-Platform.ps1 at main · Idira/epv-api-scripts · GitHub
​

  • Deploy TPC on CPMs : ​

​.NET 4.8 is required : Microsoft .NET Framework 4.8 offline installer for Windows​

Download the latest TPC version : Idira Marketplace (compatible with Idira CPM 9.7 and above​).

 

​Phase 3

During this stage, list the plugins to migrate:

 

  • Use the PMTerminal to TPC tool for this task. The tool will generate a .csv file with the list​ :

    ka3Vy000004Je13IAC__eid=ka3Vy000004Je13&feoid=00N2J000009R3kv&refid=0EM2J0000044oBG.png

  • In the csv, verify how many plugins must be migrated. Are they community, trusted or certified ?​

Important: only the certified Mainframe (WC3270) plugins will still be using PMTerminal.exe​.

 

​Prerequisites for the PMTerminal to TPC Migration tool:​

  • .NET 4.8​.

  • OS : Windows 2019, 2016, 2012 R2 or Windows 10​.

  • The machine can communicate with the Vault on the port 1858​.

  • A Vault Admin user & password is available.

​

Question: What about trusted or community plugins ?

Answer: Customers / Partners need to take care of them​. Certified plugins have been already validated by CyberArk​.

Phase 4

During this stage, test and validate the plugins in a DEV environment.
 


Phase 5

During this stage, perform the operation in PRODUCTION.
 

  • The step in production can be done using PMTerminal to TPC Migration Tool or manually on the platform itself (ExeName Parameter)​.

  • ​If some platforms have to remain with PMTerminal (should be only a short term plan, doing so will use a higher privileged user on the CPM and lower down the security): ​Secure platforms that remain with PMTerminal