Migrate to New VM location

cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 

Migrate to New VM location

L3 Networker

We are planning to move our existing CyberArk PSM and CPM servers to a new VM location (new cluster/host/storage). Please note that IP and hostname both will need to be changed.

What is the recommended or best-practice approach to migrate these components? (We can bear some downtime)

Specifically, we want to ensure:

  • No corruption of existing configurations
  • Services start correctly after migration
  • Vault/CCP/PSMP/PrivateArk connections remain intact
  • No need to fully reinstall if not required

Has anyone performed this before?

What method worked best for you—VM-level migration (cold move / snapshot / restore), and also need to modify any config(like IP changes/Hostname)

Any insights, steps, or official guidance will be appreciated.

1 accepted solution

Accepted Solutions

L7 Applicator

Hi @Ankit Kumar​ 

 

I would suggest getting a new VM with clean installation would be better. You can parallel create new PSM and CPM and add them behind current environment. This will give you clean and less impact migration.

 

But if you still want to migrate existing components to new VM then,

 

High level steps:

 

  1. Take the snapshot of PSM and CPM as a backup
  2. Stop the services on each of the components
  3. Perform VM cold move and start the VM, - Please consult with your WinTel team.
  4. Update the new IPs/Hostname wherever applicable in PVWA configuration and Vault.ini for each.
  5. Check PSM and CPM internal accounts for IP binding
  6. Perform cred file re-sync
  7. Start the service

 

 

Transfer the VM disk image or VHD to the new storage/host. It will help to ensure no corruption of the existing installation files, custom connection components, hardening settings, and the existing CyberArk directory structure.

View solution in original post

1 REPLY 1

L7 Applicator

Hi @Ankit Kumar​ 

 

I would suggest getting a new VM with clean installation would be better. You can parallel create new PSM and CPM and add them behind current environment. This will give you clean and less impact migration.

 

But if you still want to migrate existing components to new VM then,

 

High level steps:

 

  1. Take the snapshot of PSM and CPM as a backup
  2. Stop the services on each of the components
  3. Perform VM cold move and start the VM, - Please consult with your WinTel team.
  4. Update the new IPs/Hostname wherever applicable in PVWA configuration and Vault.ini for each.
  5. Check PSM and CPM internal accounts for IP binding
  6. Perform cred file re-sync
  7. Start the service

 

 

Transfer the VM disk image or VHD to the new storage/host. It will help to ensure no corruption of the existing installation files, custom connection components, hardening settings, and the existing CyberArk directory structure.

  • 1 accepted solution
  • 148 Views
  • 1 replies
  • 0 Likes
Like what you see?

Show your appreciation!

Click Like if a post is helpful to you or if you just want to show your support.

Click Accept as Solution to acknowledge that the answer to your question has been provided.

The button appears next to the replies on topics you’ve started. The member who gave the solution and all future visitors to this topic will appreciate it!

These simple actions take just seconds of your time, but go a long way in showing appreciation for community members and the LIVEcommunity as a whole!

The LIVEcommunity thanks you for your participation!